Redwood Contractors Ltd
Chippenham Drive, Kingston Ind Est, Milton Keynes, MK10 0AT
Tritec were successful in tendering for the project as main approved installer.
£175k
A Liquasil specified project that required our services for 9000m2 full metal roof re-coat, 800m2 Gutter Liquid Lining and 1500 lm of cut edge corrosion treatment. Liquasil's Metalseal 20 system was installed for the metal roof re-coat, Liquasil one gutter refurbishment system installed on the box guttering and Liquasil Flexlap treatment was installed to the cut edge corrosion. The works were successfully completed in 8 weeks with the relevant 20 and 10 year guarantees being issued.