Unit 6, Stag Trade Park, Longfield Road, Tunbridge Wells, Kent, TN2 3BF


CLIENT

Stag Trade Park

project

Cut-Edge Repair Works

PROCUREMENT

Tritec were successfully awarded the works for the Cut-Edge Repair Works.

project value

£6,700.00

Tritec Building contractors were awarded with the following works:

Cut-Edge Repair Works– Operatives treated cut edge corrosion to all roof eaves gutter edges, lap, hip & ridge joints. All corrosion to be abraded before being treated with a DriSilane® Prime. Once cured Tritec then applied Drisilane® Flex Topcoat in conjunction with DriSilane® RS sealant to form a neat bridge seal, extending the service life of the roof eaves gutter edges, lap, hip & Ridge joints for a further 15 years, complete with a comprehensive manufacturers guarantee.

THE CLIENT’S FEEDBACK


Matthew Percey - Director – “Thanks for your hard work, we are really pleased with the end result”